China
Regulator Center for Drug Evaluation (CDE), NMPA Official site ↗
eCTD v4.0
Draft / transitionThe Center for Drug Evaluation (CDE) is promoting implementation of the ICH eCTD v4.0 standard in China and guiding a smooth transition from v3.2.2 to v4.0. On 2026-05-27, CDE drafted the eCTD v4.0 Guidance (Draft for Public Comment) together with controlled-vocabulary and validation-criteria annexes, and opened it for public consultation (one month from publication). As of Sep 2026, no go-live or mandatory date has been announced.
eCTD v4.0 is still in public consultation and not yet implemented; the current mandatory version remains v3.2.2 (since 2026-03-01, for chemical and biological products). Follow CDE's official announcements and the eCTD column; do not hold back current v3.2.2 submissions waiting for v4.0. Consultation feedback: ectdfk@cde.org.cn.
eCTD v3.2.2
In forceeCTD v3.2.2 is China's current mandatory electronic submission standard, based on the ICH eCTD technical specification V3.2.2, with Module 1 as China's regional requirement. Under the NMPA Announcement No. 8 (2026), eCTD is fully implemented for chemical and biological products from 2026-03-01. To support full implementation, CDE published the revised v3.2.2 technical files (CDE Notice No. 4, 2026) on 2026-01-15, effective 2026-03-01: the mapping table between current filing requirements and eCTD / CTD directory hierarchy, eCTD technical specification V1.1 and package, eCTD implementation guide V1.1, and eCTD validation criteria V1.1.
Module 1 is China's regional requirement; the technical basis is CDE's regional specification V1.1, implementation guide V1.1 and validation criteria V1.1. eCTD submissions are made electronically via the CDE eCTD submission system (ectdapp.cde.org.cn).
Notices & updates
FAQ
Which eCTD version is implemented in China today?
The current mandatory version is eCTD v3.2.2 (with China's regional technical specification V1.1, implementation guide V1.1 and validation criteria V1.1), enforced for chemical and biological products since 2026-03-01. eCTD v4.0 remains in public consultation and is not yet implemented.
When will eCTD v4.0 be implemented in China?
No timeline yet. CDE published the eCTD v4.0 Guidance (Draft for Public Comment) on 2026-05-27 for consultation; the official line is to actively promote v4.0 implementation in China and guide a smooth v3.2.2-to-v4.0 transition, but no go-live or mandatory date has been announced.
Through which channel are eCTD submissions made in China?
Submissions are made electronically through the CDE eCTD submission system (ectdapp.cde.org.cn). Module 1 is China's regional requirement, with content and format specified by CDE.